Two bow couplings for GLDD by Straatman

Equipment

Earlier this week, Straatman BV successfully completed the production of two bow couplings for their customer Great Lakes Dredge & Dock Company (GLDD).

Straatman

This installation is designed for efficient beach and land reclamation and it realizes the connection between ship and floating hose line.

The bow discharge installation consists of the following main parts:

– Construction: guide ring and gantry construction for integration into the bow section;

– Bow coupling: female part and loose male part with floater for the connection with the floating pipe line.

Technical specifications

  • For inside pipe diameters: ø 350 – ø 1.100 mm.
  • Maximum swivel angle male part: 15°
  • Turning angle male part: > 360°
  • Maximum operating pressure: 10 – 30 Bar