Congo River detail page

Congo River
DEME
Image of Congo River
  • Year:
    2011
  • Total installed power:
    25,445kW
  • Length overall:
    168m
  • Maximum draught:
    9.84m
  • Minimal dredging depth:
    36m
  • Maximal dredging depth:
    106m
  • Hopper capacity:
    30,190m3
  • Diameter suction pipe(s):
    2x 1,300mm