Picture of the Day: Steel Cutting for “Mahury”

Business & Finance

 

The steel cutting ceremony for the new project, the 1.840 m3 twin screw trailing suction hopper dredger “Mahury”, took place at MTG Dolphin on 25th of November 2014.

This is the second ship in series (after “Albatros”), being built by order of Royal IHC for Dutch Dredging.

The vessel will be capable of dredging with one trailing suction pipe up to depths of 30 meters, delivering the spoil either into the hopper, or directly overboard.

[mappress mapid=”19404″]

Dredging Today Staff