Rohde Nielsen's trailing suction hopper dredger (TSHD) Trud R is restoring sand levels at Woorim Beach ahead of the upcoming 2026-27 summer season.
During the work, about 175,000 cubic meters of offshore sand will be pumped into shallow water. Waves and tides will then move it onto the beach and into the dune system naturally.
Erosion from weather events in recent years has narrowed the beach, eroded dunes and exposed vegetation roots. This reduces the natural buffer that helps protect nearby public and private property.
This project is part of City of Moreton Bay’s broader Coastal Hazard Adaption Strategy to ensure the safety and protection of our community and the environment from natural hazards.
