Advertisement

Dredging

about 1 year ago

Boskalis’ TSHD Gateway and backhoe Baldur raise the bar in Dampier

Over the past two years, Boskalis worked on the installation of the 433-kilometer-long gas export pipeline from the Scarborough gas field to the Pluto LNG facilities in Dampier, Western Australia. According to Boskalis, this project was made possible by the collective efforts of their specialist fle

1 minutes read
Boskalis’ TSHD Gateway and backhoe Baldur raise the bar in Dampier
photo courtesy of Boskalis

Over the past two years, Boskalis worked on the installation of the 433-kilometer-long gas export pipeline from the Scarborough gas field to the Pluto LNG facilities in Dampier, Western Australia.

According to Boskalis, this project was made possible by the collective efforts of their specialist fleet, including:

Recently, Boskalis’ subsea rock installation vessel Seahorse completed the final phase of the works: installing strategically placed rock mounts at six critical subsea crossings.

“ These ‘berms’ are essential as part of the overall design to maintaining the pipeline’s position, safeguarding it from scouring and protecting it from the ocean conditions for decades to come ,” said Boskalis .

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.