Advertisement

Coastal Protection

about 2 years ago

Standhazensedijk reinforcement project completed

Van Oord has successfully completed reinforcement of the Standhazensedijk near Drimmelen. The company has reinforced some 730 meters of the dike, so that it meets current safety standards. The project was commissioned by Brabantse Delta Water Board and is part of the Netherlands’ national Flood Prot

1 minutes read
Standhazensedijk reinforcement project completed
Photo courtesy of Van Oord

Share this article

Van Oord has successfully completed reinforcement of the Standhazensedijk near Drimmelen.

The company has reinforced some 730 meters of the dike, so that it meets current safety standards. The project was commissioned by Brabantse Delta Water Board and is part of the Netherlands’ national Flood Protection Programme.

The dike has been reinforced with a heave screen made of recycled synthetic materials, a more sustainable and cheaper alternative to traditional steel sheet piling.

Also, the embankments have been raised and netting has been installed to protect the dike against beavers and other burrowing animals. The dike is now strong, easy to inspect, manageable and maintainable. In addition to the use of recycled synthetics, other measures have been taken to realize this project as sustainably as possible.

Strong dikes are essential to be well prepared for the future. The Standhazensedijk dike reinforcement is part of the national Flood Protection Programme that was set up to future-proof flood defences throughout the Netherlands.

Advertisement

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.