DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Dredging›CSD Umm El Zemoul ready for new projects
Dredging

August 27, 2024 · about 2 years ago

CSD Umm El Zemoul ready for new projects

APT Global Marine and Offshore has completed one of the company’s biggest projects for NMDC Dredging and Marine, the repowering and upgrading of cutter suction dredger Umm El Zemoul. The project involved extensive docking scope, including cutter ladder refurbishment, spud carriage refurbishment, spu

1 minutes read
  • LinkedIn
  • X
  • Email
CSD Umm El Zemoul ready for new projects
Photo courtesy of APT Global

Share this article

APT Global Marine and Offshore has completed one of the company’s biggest projects for NMDC Dredging and Marine, the repowering and upgrading of cutter suction dredger Umm El Zemoul.

The project involved extensive docking scope, including cutter ladder refurbishment, spud carriage refurbishment, spud carriage tracks renewal & machining, crane tracks renewal, steel renewals for deck & hull, accommodation refurbishments and the massive repowering works.

“ By repowering and upgrading the cutter suction dredge, we have significantly extended its operational life and improved its performance, ensuring it meets the highest standards of efficiency and environmental responsibility ,” said Robby Van den Branden , COO, APT Global Marine and Offshore.

The repowering of the dredger included following equipment:

The detailed scope was removal of all existing engines & auxiliaries, fabrication of new foundation, installation of new engines, fabrication & installation of all piping, alignment of gear box & pumps. Commissioning of the entire systems and trials of the engine/auxiliaries to NMDC satisfaction.

The repowering process involved the installation of new, state-of-the-art engines and related system designed to reduce emissions and improve fuel efficiency. Additionally, the docking phase included thorough inspections, repairs, and upgrade to ensure the vessel’s optimal performance and safety.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

DredgingEquipmentVessels

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Dredging Africa presents new CSD
  2. 2Premier Marinas submits Brighton dredging application
  3. 3Dredging underway at Everett Harbor and Snohomish River
  4. 4PD Ports opens new Marine facility

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free