Advertisement

Breakwater Repair

about 2 years ago

Work on armor stone wall at Wilkeson Pointe moves ahead

Armor stone is being installed at Wilkeson Pointe in the former commercial shipping slip, the USACE Buffalo District said. According to USACE, this will create a wall in order for clean, dredged sediment to be placed in the slip. Approx. 285,000 cubic yards of clean sediment collected from the Buffa

1 minutes read
Work on armor stone wall at Wilkeson Pointe moves ahead

Share this article

Armor stone is being installed at Wilkeson Pointe in the former commercial shipping slip, the USACE Buffalo District said.

According to USACE, this will create a wall in order for clean, dredged sediment to be placed in the slip.

Approx. 285,000 cubic yards of clean sediment collected from the Buffalo River over a six year period is set to be placed in the slip, creating 6.7 acres of coastal wetland habitat.

The habitat will include gravel beds, rock piles, root wads, logs, and the preservation of existing dock piles to provide maximum complexity and structure.

Also, planting of native species will compete with invasive species and provide high-quality habitat for both aquatic species and birds.

Advertisement

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.