Advertisement

Dredging

about 2 years ago

EXCLUSIVE: Dredging work at Burgas Port in full swing

Dredging operations at the Burgas Port, Bulgaria, are moving forward according to schedule. The activities to deepen the area between two port terminals are expected to be completed by the end of July, said Port Infrastructure State Enterprise General Director, Ivaylo Ivanov. “The main goal of the p

1 minutes read
EXCLUSIVE: Dredging work at Burgas Port in full swing

Share this article

Dredging operations at the Burgas Port , Bulgaria, are moving forward according to schedule.

The activities to deepen the area between two port terminals are expected to be completed by the end of July, said Port Infrastructure State Enterprise General Director, Ivaylo Ivanov.

“ The main goal of the project is to provide greater depths, which will lead to the arrival of larger vessels in Burgas, including container ships ,” said Ivanov.

The planned depth of the project is nearly 16m and the dredged material is set to be transported to predetermined locations.

The work, which is managed by the private operator BMF Port Burgas, is financed by the European Union and is worth over BGN 70 million.

Advertisement

Dredging is being conducted by Bulgarian-Dutch Consortium Cosmos Van Oord DZZD.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.