Advertisement

Dredging

about 2 years ago

Annual dredging program at Brighton Marina

Premier Marinas Limited has announced that the 2024 dredging campaign is now underway at Brighton Marina. The dredging program will be carried out between the external dredging contractor, ML Dredging and Premier Marinas’ own dredger ‘Doris’. Brighton Marina is licensed by the MMO to remove 77,000 c

1 minutes read
Annual dredging program at Brighton Marina
Photo courtesy of Premier Marinas

Share this article

Premier Marinas Limited has announced that the 2024 dredging campaign is now underway at Brighton Marina.

The dredging program will be carried out between the external dredging contractor, ML Dredging and Premier Marinas’ own dredger ‘Doris’.

Brighton Marina is licensed by the MMO to remove 77,000 cubic meters or 100,000 tonnes of silt per year.

This year will see the harbor entrance and visitor bays being dredged first, followed by part of the center fairway, the southern fairway around to the lock and between pontoons 24 and 25.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.