Advertisement

Dredging

about 2 years ago

Pensar’s upgrades at Redland Bay include dredging

Pensar Infrastructure Group completed the design and construction of the SeaLink Marine & Tourism Vehicle Ferry Terminal Stage 1 upgrade at Redland Bay recently. The scope of works included: To future proof the asset, SeaLink’s requirements included expanding the existing terminal by increasing the

1 minutes read
Pensar’s upgrades at Redland Bay include dredging

Share this article

Pensar Infrastructure Group completed the design and construction of the SeaLink Marine & Tourism Vehicle Ferry Terminal Stage 1 upgrade at Redland Bay recently.

The scope of works included:

To future proof the asset, SeaLink’s requirements included expanding the existing terminal by increasing the number of vehicular loading spaces, loading lanes and check in area capacity.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.