DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Infrastructure›DWR completes removal of drought salinity barrier from West False River
Infrastructure

December 1, 2022 · about 3 years ago

DWR completes removal of drought salinity barrier from West False River

The California Department of Water Resources (DWR) has completed the removal of a drought salinity barrier from the West False River in the Sacramento-San Joaquin Delta. The barrier was installed in June 2021 to prevent saltwater intrusion with less fresh water from upstream reservoirs and streams f

2 minutes read
  • LinkedIn
  • X
  • Email
DWR completes removal of drought salinity barrier from West False River
DWR

The California Department of Water Resources (DWR) has completed the removal of a drought salinity barrier from the West False River in the Sacramento-San Joaquin Delta.

The barrier was installed in June 2021 to prevent saltwater intrusion with less fresh water from upstream reservoirs and streams flowing into the Delta during California’s ongoing extreme drought conditions.

DWR was required to remove the structure by November 30 to comply with environmental permits.

“In normal conditions, the release of fresh water from upstream reservoirs keeps the salty ocean water from pushing into the Delta, but in extreme drought conditions that doesn’t happen,” said Jacob McQuirk , DWR principal engineer. “The barrier changes the plumbing so we’re able to keep the Delta fresh while preserving upstream water supplies for other uses.”

The barrier was initially constructed in response to Governor Newsom’s April 21, 2021 state of emergency proclamation directing the Department to initiate actions necessary to prepare for and address potential Delta salinity issues during prolonged drought conditions.

Originally scheduled for removal in November 2021, the barrier was left in place when severe drought conditions continued into the winter months and beyond. DWR has now removed the barrier to comply with the terms of its environmental permits.

The removal of the barrier was completed several days ahead of the scheduled November 30 deadline.

The West False River is now open for boat and marine navigation, with the channel fully restored to its pre-project condition.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

InfrastructureTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free