DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Works progressing well on the Alotau Wharf project
Infrastructure

November 2, 2022 · about 3 years ago

Works progressing well on the Alotau Wharf project

Construction works are progressing well on the Alotau Provincial Wharf project in the south-east of Papua New Guinea, reports Pacific Marine Group (PMG). Demolition of the existing wharf is complete, and the piling works for the new structure has commenced. “The weather has been challenging with som

1 minutes read
  • LinkedIn
  • X
  • Email
Works progressing well on the Alotau Wharf project
PMG

Construction works are progressing well on the Alotau Provincial Wharf project in the south-east of Papua New Guinea, reports Pacific Marine Group (PMG).

Demolition of the existing wharf is complete, and the piling works for the new structure has commenced.

“The weather has been challenging with some significant rain events slowing works at times, but we are moving ahead well and maintaining the program,” said PMG.

Yard splicing of piles and construction of precast concrete elements in the company’s Townsville yard has been going on for many months but is now complete.

The components will now be towed to Alotau to provide materials for construction of the second portion of the new wharf. Also onboard is the new concrete pontoons and aluminium gangway which have been provided by Superior Jetties.

Overall, the project involves construction of an 80m long x 8m wide L shaped concrete wharf, founded on 38 off 711mm diameter x 16mm (or 20mm) wall thickness driven steel piles.

In addition to the main wharf, the project includes demolition of an existing wharf structure, and installation of a 24m x 4m low level wharf (floating concrete pontoon), restrained by an additional 9 piles.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Infrastructure

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Boskalis: Geopolitical tensions in the Middle East adversely impact activity levels
  2. 2Anaklia dredging project accelerates with two Jan De Nul TSHDs in the area
  3. 3VIDEO: Damen TSHD Kapuka gears up for sea trials
  4. 4Spotlight on Tuvalu Coastal Adaptation Project in Funafuti

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free