DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Technology›Maintaining South Carolina waterways
Technology

January 6, 2022 · about 4 years ago

Maintaining South Carolina waterways

The USACE Charleston District is responsible for 15 navigation projects along the South Carolina coast, stretching from Little River Inlet near the North Carolina border to Port Royal Harbor on South Carolina’s southern coast. Providing safe and navigable waterways is a priority for the District. To

2 minutes read
  • LinkedIn
  • X
  • Email
Maintaining South Carolina waterways
Jackie Pennoyer, USACE

The USACE Charleston District is responsible for 15 navigation projects along the South Carolina coast, stretching from Little River Inlet near the North Carolina border to Port Royal Harbor on South Carolina’s southern coast.

Providing safe and navigable waterways is a priority for the District.

To keep the waterways open, the navigation program is responsible for the operation and maintenance of approximately 300 miles of navigation channels, which includes Charleston Harbor, several coastal inlets (Folly River, Jeremy Creek and Murrells Inlet), and the Atlantic Intracoastal Waterway in South Carolina.

To ensure that these channels are maintained to their authorized depth, the District has two state-of-the-art survey vessels, the S/V Heiselman and the S/V Evans.

“Annually we come out and check the depth of the Atlantic Intracoastal Waterway,” said Sonja Zindars , a geographer and survey technician with Charleston District. “Since it’s a federal channel, we are responsible for keeping the depth to 12 feet. We note any problem areas so that way in our next fiscal cycle, we can dredge that area to keep watercraft moving along safely.”

The 26-foot-long S/V Heiselman serves as the District’s main vessel for conducting surveys of smaller projects, such as the Atlantic Intracoastal Waterway.

“We can do single-beam and multi-beam sonar,” said Zindars. “Today we were using single-beam sonar. Sound travels through the water and pings back up once it hits the bottom. By judging the time difference, we can tell how deep the water is. That’s recorded in software and analyzed and that’s how we make the nautical maps that USACE is responsible for providing to the National Oceanic and Atmospheric Administration.”

At 41-feet long, the S/V Evans is the larger of the two vessels. It performs hydrographic surveys for all deep draft navigation projects in Charleston District, such as the Charleston Harbor Post 45 deepening project.

By design, the S/V Evans is equipped with the same survey equipment as the S/V Heiselman.

In the case of an equipment failure on either of the vessels, the redundancy allows for things to be quickly swapped out to not delay the crew’s important work.

Story by Russell Toof, Dylan Burnell, USACE

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Technology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Anaklia dredging project accelerates with two Jan De Nul TSHDs in the area
  2. 2VIDEO: Damen TSHD Kapuka gears up for sea trials
  3. 3Spotlight on Tuvalu Coastal Adaptation Project in Funafuti
  4. 4USACE starts feasibility study for Cooper River deepening

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free