DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Dredging plan for Newburyport Fish Pier on display
Infrastructure

March 29, 2021 · about 5 years ago

Dredging plan for Newburyport Fish Pier on display

The City of Newburyport Mayor, Donna D. Holaday, has submitted a proposal for $110.1 million in capital improvements over the next five years. The proposed capital improvement program for fiscal 2022-26, presented Monday to the City Council, includes $49.4 million for infrastructure improvements; $3

1 minutes read
  • LinkedIn
  • X
  • Email
Dredging plan for Newburyport Fish Pier on display
Haslar Marina

The City of Newburyport Mayor, Donna D. Holaday, has submitted a proposal for $110.1 million in capital improvements over the next five years.

The proposed capital improvement program for fiscal 2022-26, presented Monday to the City Council, includes $49.4 million for infrastructure improvements; $39.2 million for facility renovations and repairs; $14.6 million for parks, grounds and open space; and $4 million for the replacement of vehicles and equipment.

Also included is $2.8 million for miscellaneous items such as the dredging of the city’s fish pier embayment and the reorganization of Building Department records.

The City’s Municipal Fish Pier embayment provides one of the few suitable places available for the local commercial fishing fleet to unload its catch.

Fishing is an important legacy for Newburyport, and a small commercial fishing fleet remains active.

The Fish Pier embayment and hoist are currently used by fishing boats, but the facility has been underutilized for decades as it is too shallow for an effective tie-up facility and only allows vessel access at high tide.

Survey, sampling, testing, design, cost estimating and permitting was done in 2009, recommending blasting and dredging about 11,000 SF (2,200 CY of sediment and 450 CY of rock) to a depth of -10 to -11 MLW in order to provide full-tide access to the eastern face of the Fish Pier.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Infrastructure

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Boskalis: Geopolitical tensions in the Middle East adversely impact activity levels
  2. 2Anaklia dredging project accelerates with two Jan De Nul TSHDs in the area
  3. 3VIDEO: Damen TSHD Kapuka gears up for sea trials
  4. 4Spotlight on Tuvalu Coastal Adaptation Project in Funafuti

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free