DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›Van der Leun equipment for new Water Injection Dredger
Project & Tenders

September 11, 2020 · about 6 years ago

Van der Leun equipment for new Water Injection Dredger

Van der Leun North America, Inc. recently won a contract to supply equipment for new Water Injection Dredger (WID). The contract, awarded by the IHC North America, includes construction and commissioning of the electrical switchboards for this new WID. The switchboards will be built in the Netherlan

1 minutes read
  • LinkedIn
  • X
  • Email
Van der Leun equipment for new Water Injection Dredger
Van der Leun

Van der Leun North America, Inc. recently won a contract to supply equipment for new Water Injection Dredger (WID).

The contract, awarded by the IHC North America, includes construction and commissioning of the electrical switchboards for this new WID.

The switchboards will be built in the Netherlands and shipped to America.

The water injection dredger, currently built at St Johns Shipbuilding in Palatka (FL), has an impressive flow of 20,000 GPM (4,542m3/h), a dredging depth of 55ft (16.7m), a width jet beam of 27ft (8.2m) and a total installed power of 770 HP (566kW).

After construction, the WID will be transported to Wilmington, the North Carolina State Ports Authority (NCSPA)’s largest port.

There, the dredger will perform maintenance in the main seaports of Wilmington and Morehead City in order to safeguard the depth of the ports.

The delivery of the vessel is set for the beginning of 2021.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Project & Tenders

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Asia's largest TSHD begins Binhai Port dredging program
  2. 2Dominican Republic: The Netherlands, INTEC address climate change adaptation solutions
  3. 3CHEC builds breakwater at Apia Port on Samoa
  4. 4EXCLUSIVE: TSHD Teunis Huibertus gears up for Eemshaven job

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free