DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Infrastructure›‘First Stone’ for South Jetty Project
Infrastructure

September 1, 2020 · about 6 years ago

‘First Stone’ for South Jetty Project

Pacific Northwest Waterways Association (PNWA), the U.S. Army Corps of Engineers, Portland District, and the U.S. Coast Guard had a “First Stone” Event at J.E. McAmis’ Mouth of the Columbia River South Jetty Project yesterday. Senator Wyden, Congresswoman Herrera-Beutler, Congresswoman Bonamici, CAP

1 minutes read
  • LinkedIn
  • X
  • Email
‘First Stone’ for South Jetty Project
J.E. McAmis

Pacific Northwest Waterways Association (PNWA), the U.S. Army Corps of Engineers, Portland District, and the U.S. Coast Guard had a “First Stone” Event at J.E. McAmis’ Mouth of the Columbia River South Jetty Project yesterday.

Senator Wyden, Congresswoman Herrera-Beutler, Congresswoman Bonamici, CAPT Smith – USCG Sector Columbia River Commander, and COL Mike Helton – USACE Portland District Commander were all in attendance.

Commenting the latest news, Congresswoman Herrera-Beutler said: “Jetties on the mouth of the Columbia River are vital in protecting against storms and preventing erosion and buildup of sediment that impacts the livelihoods of our ports and coastal communities.”

“This is why I’ve worked in Congress to secure federal funding to help shore up our jetties to protect our region’s most important waterway.”

Under the project, J.E. McAmis will oversee the placement of 400,000 tons of rock along the 6-mile jetty, the final piece of a three-phase rehabilitation of the jetties protecting the mouth of the Columbia River.

The repairs are expected to last until October 2024.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Infrastructure

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Heartland Fabrication invests big in hopper barge production
  2. 2Weymouth hosts public meeting on Back River dredging
  3. 3Port of Seattle: Terminal 91 dredging plan on display
  4. 4Sinocalan River dredging project on the way

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free