Advertisement

Infrastructure

about 6 years ago

TSHD Ghasha Ready for action

National Marine Dredging Company (NMDC) announced today that their second custom-built trailing suction hopper dredger (TSHD) Ghasha has successfully completed sea trails. Following the completion of trials, the 8.000m³ Ghasha is now on her way to the first dredging project in Abu Dhabi, NMDC report

1 minutes read
TSHD Ghasha Ready for action
NMDC

National Marine Dredging Company (NMDC) announced today that their second custom-built trailing suction hopper dredger (TSHD) Ghasha has successfully completed sea trails.

Following the completion of trials, the 8.000m³ Ghasha is now on her way to the first dredging project in Abu Dhabi, NMDC reported.

The launching ceremony of the new dredger took place earlier this year at the Royal IHC Kinderdijk yard.

The newbuild has a number of innovations, including an enlarged hopper capacity and a larger dredging depth of 45 meters.

The technologically advanced design of the Ghasha is a result of the close cooperation between Royal IHC and NMDC.

This has led to a tailor-made solution that combines a shallow draft and a large dredging depth.

Advertisement

This is coupled with a high level of maneuverability and suitability for operating in challenging environments with high temperatures.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.