DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Absecon Island nourishment contract for GLDD
Infrastructure

August 4, 2020 · about 6 years ago

Absecon Island nourishment contract for GLDD

The U.S. Army Corps of Engineers’ Philadelphia District recently awarded a contract to Great Lakes Dredge & Dock Company (GLDD) for $23.8 million to complete periodic nourishment of the Absecon Island Coastal Storm Risk Management project in Atlantic County, N.J. The contract calls for placing appro

2 minutes read
  • LinkedIn
  • X
  • Email
Absecon Island nourishment contract for GLDD
USACE

The U.S. Army Corps of Engineers’ Philadelphia District recently awarded a contract to Great Lakes Dredge & Dock Company (GLDD) for $23.8 million to complete periodic nourishment of the Absecon Island Coastal Storm Risk Management project in Atlantic County, N.J.

The contract calls for placing approximately two million cubic yards of sand onto the beach in Atlantic City, Ventnor City, Margate City, and the borough of Longport.

Sand will be dredged from two designated borrow areas – one located within Absecon Inlet and the other in the Atlantic Ocean offshore of the island. The sand is then pumped onto the beach, and graded into an engineered template, which is designed to reduce damages from coastal storm events.

“Most of the work involves widening the beach; however in some areas, dunes, beach access paths/crossovers, and sand fencing will be repaired. Dune grass will be planted in areas that undergo repairs. There are also contract options to place additional sand and these options could be exercised depending on surveys and the condition of the beaches. The cost of the base contract and all of the contract options is $30.69 million,” said USACE.

The project is a joint effort of the Army Corps’ Philadelphia District, the New Jersey Department of Environmental Protection and the municipalities.

The beachfill project was initially constructed in 2004 in Atlantic City and Ventnor City. Initial construction of the beachfill portion of the project in Margate City and the Borough of Longport was completed in 2018.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Infrastructure

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free