DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Authorities & Government›Study on Illinois dredged material pilot project
Authorities & Government

August 3, 2020 · about 6 years ago

Study on Illinois dredged material pilot project

The U.S. Army Corps of Engineers, Chicago District has posted a draft feasibility report, Public Beach Protection in Four Illinois Coastal Communities Beneficial Use of Dredged Material Pilot Project, for a 30- day public review period that will end on Aug. 31, 2020. The purpose of this pilot projec

1 minutes read
  • LinkedIn
  • X
  • Email
Study on Illinois dredged material pilot project

The U.S. Army Corps of Engineers, Chicago District has posted a draft feasibility report, Public Beach Protection in Four Illinois Coastal Communities Beneficial Use of Dredged Material Pilot Project, for a 30- day public review period that will end on Aug. 31, 2020.

The purpose of this pilot project is to beneficially use dredged material from Waukegan Harbor to provide ecosystem restoration, shoreline protection, and recreation benefits in four Illinois coastal communities.

This report documents the feasibility of the proposed activity and how it achieves the stated goals for the pilot program as outlined in the implementation guidance for Section 1122 of the Water Resources Development Act of 2016.

The report builds upon the updated Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) that the Chicago District completed for Waukegan Harbor maintenance dredging and placement in 2019.

This 2019 EA and FONSI analyzed the affected environment of the placement locations and the environmental impacts of all of the measures that are being included in the current feasibility report.

As such, the Chicago District is specifically seeking public input related to the plan development, evaluation, comparison, and recommendation presented in the feasibility report.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Authorities & Government

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PD Ports opens new Marine facility
  2. 2PHOTO OF THE DAY: Swiss Army Knife of Great Lakes in Ashtabula
  3. 3Puerto de Sevilla completes Guadalquivir dredging
  4. 4McLaughlin & Harvey appointed to Dover' Project Contractor Framework

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free