DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Fifth Missouri River Levee System Returned to Full Height
Business & Finance

March 5, 2020 · about 6 years ago

Fifth Missouri River Levee System Returned to Full Height

As of Monday, repairs on the Missouri River Levee System L-550 returned the entirety of the levee system to its pre-flood height, informs the Army Corps’ Omaha District. USACE also added that repair efforts remain ongoing on this levee system, such as relief well testing and replacement. Although th

1 minutes read
  • LinkedIn
  • X
  • Email
Fifth Missouri River Levee System Returned to Full Height
Image source: USACE

As of Monday, repairs on the Missouri River Levee System L-550 returned the entirety of the levee system to its pre-flood height, informs the Army Corps’ Omaha District.

USACE also added that repair efforts remain ongoing on this levee system, such as relief well testing and replacement.

Although the system has been returned to its pre-flood height, there is still an elevated risk until all of the damages on the levee system can be repaired.

“ This is the fifth Missouri River Levee System that we have returned to full height, providing critical repairs in advance of the upcoming runoff season. While there is still a lot of work to be done on this levee system, this does mark a major accomplishment for the team ,” said Brendan Kight, Area Engineer for the Flood Recovery Construction Office .

There are more than 350 miles of levees on the Missouri, Platte and Elkhorn rivers, and tributaries that experienced significant flood damage since March 2019.

Due to the magnitude of damage along these levees, repair of the levee system efforts will take an extended period of time to complete.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Essar secures LoA for Tuna Tekra terminal in Gujarat
  2. 2China to adjust export control measures on dredger-related items
  3. 3PHOTO OF THE DAY: NMDC Group's new dredger Abu Al Bakhoush
  4. 4Helping restore Banana River Lagoon (VIDEO)

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free