DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Kentucky Point Dike Project Complete
Business & Finance

February 9, 2020 · about 6 years ago

Kentucky Point Dike Project Complete

The Memphis District of the Army Corps recently completed another important Mississippi River project located just across the Mississippi River from New Madrid, Missouri. The stone dike construction project, named Kentucky Point, Kentucky, was designed to assist in maintaining a safe and reliable na

1 minutes read
  • LinkedIn
  • X
  • Email
Kentucky Point Dike Project Complete
Image source: USACE

The Memphis District of the Army Corps recently completed another important Mississippi River project located just across the Mississippi River from New Madrid, Missouri.

The stone dike construction project, named Kentucky Point, Kentucky, was designed to assist in maintaining a safe and reliable navigation channel for commercial towboats in the Mississippi River.

It also directly supports the Mississippi River Channel Improvement navigation mission.

“ The need for the project was identified as a result of feedback received from our navigation industry partners identifying this area as a low water problem spot for navigation on the river as well as due to required dredging by the Dredge Hurley in recent low water periods ,” Civil Engineer and Channel Improvement Project Manager Zachary Cook explained.

The contract for this work was awarded in July of 2018 but work could not start at that time due to an extended period of high water and the flood of 2019.

“ Work was started in early December of 2019 where Luhr Brothers Inc., the contractor, placed over 100,000 tons of stone to complete the construction of five stone dikes in a little over two weeks, ” Cook noted. “ The design was performed by the Memphis District River Engineering Team with construction administration performed by the Construction Branch and Caruthersville Area Office. We also partnered with the U.S. Coast Guard and the Lower Mississippi River Committee on this project .”

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Boskalis: Geopolitical tensions in the Middle East adversely impact activity levels
  2. 2Anaklia dredging project accelerates with two Jan De Nul TSHDs in the area
  3. 3VIDEO: Damen TSHD Kapuka gears up for sea trials
  4. 4Spotlight on Tuvalu Coastal Adaptation Project in Funafuti

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free