DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Wabasha Dredged Material Management Plan on the Table
Business & Finance

April 25, 2019 · about 7 years ago

Wabasha Dredged Material Management Plan on the Table

U.S. Army Corps of Engineers, St. Paul District, and city of Wabasha, Minnesota, leadership met to discuss the dredged material management plan for Lower Pool 4, April 19. The Corps is working in partnership with the city in an effort to find a suitable, permanent home for nearly 270,000 cubic yards

1 minutes read
  • LinkedIn
  • X
  • Email

U.S. Army Corps of Engineers, St. Paul District, and city of Wabasha, Minnesota, leadership met to discuss the dredged material management plan for Lower Pool 4, April 19.

The Corps is working in partnership with the city in an effort to find a suitable, permanent home for nearly 270,000 cubic yards of material dredged annually from an area within the Mississippi River south of Lake Pepin to Wabasha.

The material needs to be removed from the river to ensure the 9-foot navigation channel remains open for the navigation industry.

The Corps’ current plan eliminates the need to use the Southside Fitzgerald location near River Drive, an area identified within the city for its close proximity to the river, as well as previously identified agricultural lands.

The new planning effort explores options such as partnering with the city under a program known as Section 217(d). This program was developed with the passage of the Water Resources Development Act of 1996. Under this program, the city would become an active partner in the removal and permanent placement of dredged material.

Elsewhere, Corps officials are actively pursuing options to acquire all necessary real estate requirements through the use of willing sellers.

With the amount of material generated by this section of the Mississippi River, a permanent upland placement site will still need to be identified. The Corps is actively seeking willing sellers in the areas between Wabasha and Winona, Minnesota.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  2. 2Høj Nordic completes Schleswig-Holstein annual dredging
  3. 3Oceanside Harbor's channel dredging about to begin
  4. 4HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free