DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Minot Flood Project Gets OK
Business & Finance

April 17, 2019 · about 7 years ago

Minot Flood Project Gets OK

The Mouse River Flood Protection Plan received a major boost April 16 when the U.S. Army Corps of Engineers Chief of Engineers signed the Chief’s Report, endorsing the Corps’ Final Feasibility Report and Environmental Assessment on this project. Lt. Gen. Todd Semonite, 54th Chief of Engineers and Co

2 minutes read
  • LinkedIn
  • X
  • Email

The Mouse River Flood Protection Plan received a major boost April 16 when the U.S. Army Corps of Engineers Chief of Engineers signed the Chief’s Report, endorsing the Corps’ Final Feasibility Report and Environmental Assessment on this project.

Lt. Gen. Todd Semonite, 54th Chief of Engineers and Commanding General for the Corps of Engineers, signed the report authorizing the federal portion of the flood risk reduction project. By signing the report, the Chief is recommending the project be authorized as described in the final report prepared by the Corps.

The next step will include the Corps submitting the report and study to the Assistant Secretary of the Army for Civil Works, who will coordinate with the Office of Management and Budget before transmitting a formal, final recommendation to Congress. There is no current timeline for authorization.

USACE’s St. Paul District, and Souris River Joint Water Resource Board worked in partnership to conduct a feasibility study and develop a flood risk management project for the Souris River Basin.

The recommended project that came out of the study includes building a diversion channel along Maple Street parallel to the BNSF Railroad tracks, and a 1,200 foot long earthen levee along the north side of the diversion, river control structures and road and railroad closure structures.

The plan would fill the gap between phases of the Mouse River Enhanced Flood Protection Plan, which is the local plan developed after the flood.

The signing took place during a special meeting at Minot Hall with Sen. John Hoeven and other state and federal officials April 16.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  2. 2Høj Nordic completes Schleswig-Holstein annual dredging
  3. 3Oceanside Harbor's channel dredging about to begin
  4. 4HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free