DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Pawcatuck CSRM Study Complete, Coastal Protection Plan on the Way
Business & Finance

December 23, 2018 · about 7 years ago

Pawcatuck CSRM Study Complete, Coastal Protection Plan on the Way

The U.S. Army Corps of Engineers’ New England District has completed the Pawcatuck River Coastal Storm Risk Management (CSRM) feasibility study and now is proposing a plan to reduce potential storm and flooding impacts to Westerly, Charlestown, South Kingstown and Narragansett, RI. The study area in

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers’ New England District has completed the Pawcatuck River Coastal Storm Risk Management (CSRM) feasibility study and now is proposing a plan to reduce potential storm and flooding impacts to Westerly, Charlestown, South Kingstown and Narragansett, RI.

The study area included about 28 miles of moderately developed coast in the towns in Washington County.

“ The floodplain completely encompasses the coastal barrier beaches and salt ponds in the area. There is a demonstrated need for coastal resiliency measures to be implemented in south coastal Rhode Island. Residential and commercial properties in the Pawcatuck River coastal floodplain are all vulnerable to inundation from coastal storms,” said USACE.

This study was conducted under the Disaster Relief Appropriations Act of 2013 for Hurricane Sandy impacts, according to Project Manager Christopher Hatfield, of the Corps of Engineers, New England District, Planning Division in Concord, Mass.

The Recommended Plan for the Pawcatuck River CSRM project consists of elevating the first floors of 247 structures in the four study area communities.

The first floors will be elevated to a height corresponding to the Federal Emergency Management Agency (FEMA) designated Base Flood Elevation (BFE), ranging from +11 feet North Atlantic Vertical Datum of 1988 (NAVD88) to +17 feet NAVD88, plus 1 additional foot in accordance with Corps/NFIP standards, 0.8 feet to account for intermediate sea level rise over the next 50 years, and another 0.2 feet to account for sea level rise which has occurred since the current sea level was published (1992) to present.

The proposed plan was coordinated with: U.S. Fish and Wildlife Service; U.S. Environmental Protection Agency; U.S. National Marine Fisheries Service; Rhode Island Department of Environmental Management, Office of Water Resources, Bureau of Natural Resources, Division of Fish and Wildlife – Marine Fisheries; Rhode Island Coastal Resources Management Council; The Nature Conservancy, Rhode Island Chapter; Save the Bay; Wood-Pawcatuck Watershed Association; Rhode Island Historical Preservation and Heritage Commission; Narragansett Indian Tribe – Tribal Historic Preservation Office; and the towns of Westerly, Charlestown, South Kingstown and Narragansett.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Boskalis and Van Oord begin IJsselmeerdijk project
  2. 2USACE completes West Harbor dredging project
  3. 3EXCLUSIVE: GRSE, Damen sign MoU on construction of advanced dredgers
  4. 4Lyttelton Port gears up for its largest expansion project

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free