DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USACE Proposes Dredging of Hampton Harbor Federal Navigation Project
Business & Finance

December 11, 2018 · about 7 years ago

USACE Proposes Dredging of Hampton Harbor Federal Navigation Project

The U.S. Army Corps of Engineers, New England District, is proposing to perform maintenance dredging of the Hampton Harbor Federal navigation project in Seabrook and Hampton, New Hampshire, and the state anchorage in Hampton. The proposed work involves maintenance dredging of the 8-foot Mean Lower L

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, New England District, is proposing to perform maintenance dredging of the Hampton Harbor Federal navigation project in Seabrook and Hampton, New Hampshire, and the state anchorage in Hampton.

The proposed work involves maintenance dredging of the 8-foot Mean Lower Low Water (MLLW) anchorage on the Seabrook side, the 8-foot and 6-foot MLLW anchorage areas on the Hampton side, and the 8-foot MLLW inner channels connecting both areas with the entrance channel, plus an authorized 1 foot of overdepth, in the Hampton Harbor FNP.

Additionally, the proposed work involves maintenance dredging of the state of New Hampshire’s 6-foot MLLW anchorage, plus authorized overdepth.

“Maintenance dredging of approximately 150,000 cubic yards of sandy material from the authorized project area will maintain the Federal Navigation Project and state of New Hampshire Anchorage to required and authorized dimensions,” said Project Manager Ms. Coral Siligato , of the Corps’ New England District, Programs/Project Management Division in Concord, Mass.

Dredging will be conducted with a hydraulic dredge, hopper dredge, or combination of the two. The state’s maintenance project involves dredging approximately 2,500 cubic yards of sand from the upper 6-foot anchorage area in Hampton.

Construction activities involving hydraulic dredging will be performed during a five-month period between Oct. 1 and March 15. Dredging of the inner harbor would be performed between Oct. 15 and Feb. 1, dredging and placement activities in the entrance channel would occur between Oct. 15 and March 15, and work on the receiving beaches would occur between Oct. 1 and March 15.

In the event that the government-owned hopper dredge performs work in Hampton Harbor, the work would be limited to the entrance channel and would occur between May 1 and July 31, of the year in which the work takes place.

The work is currently anticipated to be performed in 2019/2020.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  2. 2Høj Nordic completes Schleswig-Holstein annual dredging
  3. 3Oceanside Harbor's channel dredging about to begin
  4. 4HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free