DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Milestone for New IJmuiden Sea Lock Project
Business & Finance

November 15, 2018 · about 7 years ago

Milestone for New IJmuiden Sea Lock Project

A major milestone has been achieved in the construction of the new IJmuiden sea lock, with the successful immersion of the caisson for the outer lock head into its final position, informs Royal BAM Group. The caisson, in and out of which the lock gates will slide, is the size of an apartment buildin

2 minutes read
  • LinkedIn
  • X
  • Email

A major milestone has been achieved in the construction of the new IJmuiden sea lock, with the successful immersion of the caisson for the outer lock head into its final position, informs Royal BAM Group.

The caisson, in and out of which the lock gates will slide, is the size of an apartment building, 80 meters long, 26 meters wide and 22 meters high. Over recent months it has been immersed centimeter by centimeter to the right depth, in a controlled manner, as planned.

The caisson was sunk into the ground using remote-controlled robotic arms to remove the underlying sand. This fully automated process was monitored 24/7 using sensors, measuring instruments and cameras installed underneath the caisson. The next step will be to fill the space beneath the caisson with concrete.

In 2019, the inner lock head caisson – measuring 80 meters long, 55 meters wide and 25 meters high – will be immersed into its final position using the same method.

New sea lock IJmuiden

Work has been underway in IJmuiden since 2016 to construct the world’s largest sea lock, which will accommodate increasingly large seagoing vessels. The new lock, which will be 500 meters long, 70 meters wide and 18 meters deep, is a joint project between the Dutch Ministry of Infrastructure and Water Management, the province of Noord-Holland, the municipality of Amsterdam, Port of Amsterdam and the municipality of Velsen.

Commissioned by Rijkswaterstaat, the new sea lock is being built by contracting consortium, OpenIJ.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceProject & Tenders

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Tybee Island gets $20M for beach renourishment works
  2. 2House passes WRDA 2026 with NC-07 priorities included
  3. 3PD Ports: Work underway on South Gare breakwater
  4. 4Van Oord's backhoe Simson busy in Portugal

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free