DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Comment Period Extended for Missouri River ESH Project
Business & Finance

June 18, 2018 · about 8 years ago

Comment Period Extended for Missouri River ESH Project

The U.S. Army Corps of Engineers will extend the public comment period to July 6 for the draft environmental assessment of the proposed Missouri River Emergent Sandbar Habitat project near Washburn, North Dakota. According to the Corps, the proposed project includes mechanical construction of sandba

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers will extend the public comment period to July 6 for the draft environmental assessment of the proposed Missouri River Emergent Sandbar Habitat project near Washburn, North Dakota.

According to the Corps, the proposed project includes mechanical construction of sandbar habitat, up to approximately 24 acres in size, at river mile 1348 (near Washburn).

“ Material would be borrowed from the river bed and placed on top of the existing shallow submerged sandbar. This minimizes the amount of material that needs to be moved and increases longevity of the constructed sandbar ,” reported USACE.

The purpose of the ESH Program is to maintain suitable habitat for the federally endangered interior least tern and threatened piping plover.

The ESH Program integrates actions in accordance with the sub-objectives established in the U.S. Fish and Wildlife Service’s 2018 Biological Opinion on the Operation of the Missouri River Mainstem Reservoir System and Operation and Maintenance of the Missouri River Bank Stabilization and Navigation Project.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceProject & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Boskalis: Geopolitical tensions in the Middle East adversely impact activity levels
  2. 2Anaklia dredging project accelerates with two Jan De Nul TSHDs in the area
  3. 3VIDEO: Damen TSHD Kapuka gears up for sea trials
  4. 4Spotlight on Tuvalu Coastal Adaptation Project in Funafuti

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free