DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Ulverston Flood Scheme Officially Opened
Business & Finance

May 13, 2018 · about 8 years ago

Ulverston Flood Scheme Officially Opened

More than 500 homes and businesses in Cumbria will be better protected from flooding thanks to a new £9.5 million scheme completed by the Environment Agency. According to the EA, the Town Beck Flood Alleviation Scheme in Ulverston, Cumbria, will reduce flood risk to more than 400 homes and more than

2 minutes read
  • LinkedIn
  • X
  • Email

More than 500 homes and businesses in Cumbria will be better protected from flooding thanks to a new £9.5 million scheme completed by the Environment Agency.

According to the EA, the Town Beck Flood Alleviation Scheme in Ulverston, Cumbria, will reduce flood risk to more than 400 homes and more than 100 businesses, as well as critical tourism infrastructure.

Emma Howard Boyd, Chair of the Environment Agency , officially opened the scheme last Friday, and said: “Cumbrian communities know well the devastation that flooding can cause. The Town Beck flood defense will better protect 500 homes and businesses in Ulverston and support England’s tourist economy by improving protection for the railway that leads to the Lake District .”

Town Beck lies within a steep catchment and predominantly runs underground through the town center. The new scheme consists of a number of sections throughout the town center including raising existing flood defense walls, installing new floodgates, repairing and refurbishing the underground water channels (culverts), and building a swale in the natural flood plain to ensure that there is no increase to flood risk in South Ulverston.

Much of the scheme is underground, so different construction techniques known as ‘trenchless technologies’ were used. In some cases Environment Agency contractors installed reinforced plastic sleeves to repair pipes – or worked underground wearing specialist breathing apparatus to spray concrete on the inside of the culvert for extra strength.

The scheme will provide a significant improvement in the standard of protection for the area, which has been affected by flooding several times in recent years – most recently in 2009 and in 2012.

[mappress mapid=”25130″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Boskalis and Van Oord begin IJsselmeerdijk project
  2. 2USACE completes West Harbor dredging project
  3. 3EXCLUSIVE: GRSE, Damen sign MoU on construction of advanced dredgers
  4. 4Lyttelton Port gears up for its largest expansion project

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free