DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›PHOTO: Damen DOP Dredge Pump Busy in Florida
Business & Finance

May 17, 2017 · about 9 years ago

PHOTO: Damen DOP Dredge Pump Busy in Florida

American contractor Cashman Dredging & Marine Contracting in September 2014 took delivery of the Damen DOP submersible dredge pump. Since then, the DOP450L high efficiency pump has completed many jobs throughout the USA, recently completing one in Puerto Rico. On its current job in Tampa, Florida, t

1 minutes read
  • LinkedIn
  • X
  • Email

American contractor Cashman Dredging & Marine Contracting in September 2014 took delivery of the Damen DOP submersible dredge pump.

Since then, the DOP450L high efficiency pump has completed many jobs throughout the USA, recently completing one in Puerto Rico.

On its current job in Tampa, Florida, the DOP450L was integrated in a recently built hydraulic unloader, called “Kraken”.

Here, the submersed dredge pump is attached to a Komatsu hydraulic excavator, type PC1250, which has been customized specifically for the pumping operation.

The DOP pump has been fitted out with a reinforced casing and heavy duty suction head making it the perfect tool for unloading barges, or hopper scows as they are also called.

The hopper scows are 5.000 CY (being some 3.800m³). They are pushed alongside the hydraulic offloader pontoon, where plenty of transport water is added to the cargo. Generally, the material to be pumped is mud and clay from a maintenance dredging project. Some 4.000m³/h of mixture is pumped 1.100m to a disposal area using a booster pump and sinker pipe line.

Once this job is completed, the DOP barge unloader “Kraken” has plenty of new jobs lined up throughout the winter ‘17/’18.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceEquipmentTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Spotlight on $642M Oakland Harbor turning basins widening
  2. 2Lewes & Rehoboth Canal dredging set for October
  3. 3EXCLUSIVE: Van Oord's dredger Utrecht returns to Itajaí
  4. 4Weeks Marine completes beach nourishment in Nags Head

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free