DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Damen Cutter Suction Dredger 350 Delivered to Heuvelman Ibis
Business & Finance

May 1, 2017 · about 9 years ago

Damen Cutter Suction Dredger 350 Delivered to Heuvelman Ibis

A Damen cutter suction dredger (CSD) 350 has been delivered from Damen Dredging Equipment in Nijkerk, the Netherlands, to start work on a canal dredging assignment in the province of Groningen, in the north of the country. In order to execute the project, which involves the extraction of approximate

2 minutes read
  • LinkedIn
  • X
  • Email

A Damen cutter suction dredger (CSD) 350 has been delivered from Damen Dredging Equipment in Nijkerk, the Netherlands, to start work on a canal dredging assignment in the province of Groningen, in the north of the country.

In order to execute the project, which involves the extraction of approximately 220,000m³ of sediment from the Winschoterdiep canal, the Netherlands-based marine contractor Heuvelman Ibis required a heavy-duty dredger at short notice.

Two Damen BS 350 booster stations to enable pumping over long distances were also included in the order, placed in January.

Prior to delivery a number of options were added to the CSD 350 so as to optimize it for the project. These included a spud carriage pontoon to further boost production, and also the addition of anchor booms to allow unassisted re-positioning. A complete production measurement system has also been installed.

“The result is a compact, highly efficient and accurate dredging machine. These options have not previously been offered on a CSD 350, but having been developed for this order will now become standard options for future clients,” Damen said.

The dredger was towed to Delfzijl, a journey taking 48 hours, to await deployment while the booster stations were transported by road. Final assembly took a week, followed by a few days of testing, after which the dredger was fully operational.

The fulfilment of the order, including designing and installing the options, and general finishing, took just 3 months, Damen said.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceEquipmentTechnologyVessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: Van Oord's dredger Utrecht returns to Itajaí
  2. 2Weeks Marine completes beach nourishment in Nags Head
  3. 3BREAKING NEWS: Pinglu Canal passes completion acceptance inspection
  4. 4Split hopper dredger Trud R busy at the Seaway

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free