DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›PETRUS PLANCIUS New Silt Suction Head Proves Success
Business & Finance

February 8, 2017 · about 9 years ago

PETRUS PLANCIUS New Silt Suction Head Proves Success

Jan De Nul recently put its suction dredger, PETRUS PLANCIUS, back into operation after a successful conversion into an environmental dredger. IHC Services designed the technical solution that could operate the dredger with either a cutter or silt suction head. The IHC Beaver 1600, built in 2008, ne

1 minutes read
  • LinkedIn
  • X
  • Email

Jan De Nul recently put its suction dredger, PETRUS PLANCIUS, back into operation after a successful conversion into an environmental dredger.

IHC Services designed the technical solution that could operate the dredger with either a cutter or silt suction head.

The IHC Beaver 1600, built in 2008, needed to be adjusted for a challenging environmental dredging project in the port of Oskarshamn in Sweden. It was vital that the dredger would be able to dredge the contaminated silt in the harbor with high density and low spillage, reported IHC.

High density and low spillage

The dredging equipment and hydraulic system of the dredger needed to be modified for the project. Jan De Nul required its self-designed innovative silt suction head to replace the existing cutter head and drive.

IHC designed the adjustments to the hydraulic system, and delivered a submerged dredge pump (TT30-250). The pump was adapted for mounting in the existing suction pipe on the cutter ladder of the PETRUS PLANCIUS.

In addition, IHC supplied the necessary components and project documentation, and supervised the installation and commissioning. After the successful commissioning of the dredger, IHC Services also delivered a spare parts package for the new equipment.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceEquipmentTechnology

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Partner Stocznia, Vuyk sign contract for new TSHD
  2. 2Western Bay of Plenty District: $576,000 upgrade for Katikati seawall
  3. 3Protecting Sri Lanka's coastal biodiversity
  4. 4PHOTO OF THE DAY: Modi R wraps up Geraldton dredging

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free