DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Roberts Bank Terminal 2 – March 2016 Update
Business & Finance

March 10, 2016 · about 10 years ago

Roberts Bank Terminal 2 – March 2016 Update

Port Metro Vancouver is continuing field studies in March 2016 as part of ongoing environmental and technical work for the Container Capacity Improvement Program. The Container Capacity Improvement Program was announced in 2011, and is Port Metro Vancouver’s long-term strategy to ensure the timely d

1 minutes read
  • LinkedIn
  • X
  • Email

Port Metro Vancouver is continuing field studies in March 2016 as part of ongoing environmental and technical work for the Container Capacity Improvement Program.

The Container Capacity Improvement Program was announced in 2011, and is Port Metro Vancouver’s long-term strategy to ensure the timely delivery of required infrastructure to meet anticipated growth in the container sector.

In planning for future capacity with this objective, Port Metro Vancouver considered opportunities to:

Roberts Bank Terminal 2 Project

The Roberts Bank Terminal 2 Project is a proposed new three‐berth container terminal that would provide 2.4 million twenty-foot equivalent units (TEUs) of additional container capacity annually.

The Project is undergoing a federal environmental assessment by an independent review panel, under the Canadian Environmental Assessment Act, 2012. It is also undergoing an assessment under the British Columbia Environmental Assessment Act, and requires other permits and authorizations before it can proceed.

In March, Port Metro Vancouver together with its contractors will conduct following field studies: coastal geomorphology, abiotic parameters study, fresh water fish and fish habitat, fresh water fish sampling, marine mammals and marine mammal observation study.

[mappress mapid=”22084″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceProject & Tenders

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Boskalis and Van Oord begin IJsselmeerdijk project
  2. 2USACE completes West Harbor dredging project
  3. 3EXCLUSIVE: GRSE, Damen sign MoU on construction of advanced dredgers
  4. 4Lyttelton Port gears up for its largest expansion project

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free