DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›VIDEO: Sigmaplan – Flood Defense Plan
Business & Finance

March 5, 2015 · about 11 years ago

VIDEO: Sigmaplan – Flood Defense Plan

After the 1953 and 1976 North Sea floods, a flood defense plan, called the Sigma Plan, was conceived to protect the Flemish part of the Scheldt estuary against future storm surges. The plan is governed by Waterwegen en Zeekanaal NV (W&Z), a Flemish government agency and since 2005 aims to combine fl

2 minutes read
  • LinkedIn
  • X
  • Email

After the 1953 and 1976 North Sea floods, a flood defense plan, called the Sigma Plan, was conceived to protect the Flemish part of the Scheldt estuary against future storm surges.

The plan is governed by Waterwegen en Zeekanaal NV (W&Z), a Flemish government agency and since 2005 aims to combine flood defense with strengthening the river’s ecology through the creation of flood control areas.

Maintaining the navigability of inland waterways is also a key task of W&Z, whereby a huge amount of sediments are produced. W&Z set up a pilot project in Dendermonde, involving the construction of a compartment dyke of a flood control area using dredged material from the River Scheldt without intermediate storage between the dredging and the construction process.

Jan De Nul Group and its environmental subsidiary Envisan set out an extensive testing campaign to develop engineered sediments for use in the construction phase. This involved the testing of specific additives on the geotechnical characteristics of the dredged material.

Based on the results of the geotechnical dyke model and an economical appraisal, a specific combination was identified for large-scale use. After being mechanically dredged and transported by barges to a location near the flood defence works, the sediments are pumped ashore to the mixing plant.

The dredged material is delivered to a pontoon equipped with screens and a set of piston pumps able to push the relatively dry sediment approximately 600 m to the mixing plant.

To ensure that the dyke exhibits the performance as intended in the design calculations a Quality Assurance / Quality Control (QA/QC) program is installed. Multiple field tests are executed during construction to determine strength and permeability of the engineered sediments in the dyke body.

More info

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceEquipmentTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Boskalis: Geopolitical tensions in the Middle East adversely impact activity levels
  2. 2Anaklia dredging project accelerates with two Jan De Nul TSHDs in the area
  3. 3VIDEO: Damen TSHD Kapuka gears up for sea trials
  4. 4Spotlight on Tuvalu Coastal Adaptation Project in Funafuti

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free