DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Mill River Dredging Starts Soon
Business & Finance

October 7, 2014 · about 12 years ago

Mill River Dredging Starts Soon

Over the next several weeks, there will be increased activity on the Mill River in Fairfield, Connecticut in preparation for the upcoming dredging activities, according to the First Selectman Mike Tetreau. TRC Environmental Corp (the engineering firm that will be conducting the cleanup work) will be

1 minutes read
  • LinkedIn
  • X
  • Email

Over the next several weeks, there will be increased activity on the Mill River in Fairfield, Connecticut in preparation for the upcoming dredging activities, according to the First Selectman Mike Tetreau.

TRC Environmental Corp (the engineering firm that will be conducting the cleanup work) will begin deploying boats, barges, dredging equipment and other equipment into the Mill River and adjacent to Exide Group Inc.’s (Exide’s) property.

As part of the in-water preparations, TRC has installed floating turbidity meters (yellow buoys with solar panels) to collect background water quality data. The barge-mounted dredge will be moved upstream and positioned in Area V (northern most section of the Mill River site). Turbidity curtains and a discharge pipeline will also be installed.

When dredging is completed for the season, the equipment will be removed from the river and stored at Exide’s property for the winter.

The Mill River Cleanup project will involve the following:

A public information meeting on the cleanup will be held Oct. 14 from 7 to 9 p.m. at the Board of Education conference room, 501 Kings Highway East, and on Oct. 15, dredging will begin in Area V.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceEquipmentTechnology

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  2. 2Høj Nordic completes Schleswig-Holstein annual dredging
  3. 3Oceanside Harbor's channel dredging about to begin
  4. 4HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free