DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›EPA Extends Comment Period for Housatonic Cleanup
Business & Finance

September 15, 2014 · about 12 years ago

EPA Extends Comment Period for Housatonic Cleanup

EPA is extending the comment period on its Draft Modification to General Electric’s Reissued RCRA Permit (also referred to as the Proposed Cleanup Plan for the Housatonic River Rest of River). In response to several requests for extension, public comments on the Draft Permit will be accepted through

1 minutes read
  • LinkedIn
  • X
  • Email

EPA is extending the comment period on its Draft Modification to General Electric’s Reissued RCRA Permit (also referred to as the Proposed Cleanup Plan for the Housatonic River Rest of River).

In response to several requests for extension, public comments on the Draft Permit will be accepted through Oct. 27, 2014. EPA will also hold a public hearing on the Draft Modification to the RCRA Permit on Sept. 23 at 6:30 p.m. at Lenox Memorial Middle and High School (Duffin Theater).

The Draft Modification to the RCRA Permit sets forth EPA’s Proposed Remedial Action and Operation and Maintenance requirements for the Rest of River. The Rest of River begins at the confluence of the East and West branches of the Housatonic River in Pittsfield, Massachusetts and extends into Connecticut.

At the end of May, EPA released its Statement of Basis for EPA’s Proposed Remedial Action for the Housatonic River “Rest of River” and the associated Draft Modification to the RCRA Permit. Public Informational meetings were held on June 18 in Lenox, Massachusetts and June 24 in Kent, Connecticut. EPA initiated the formal public comment period on the Draft Permit Modification on June 25, 2014.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceEquipmentTechnology

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  2. 2Høj Nordic completes Schleswig-Holstein annual dredging
  3. 3Oceanside Harbor's channel dredging about to begin
  4. 4HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free