Uljanik to Build Dredger for IHC Merwede

Business & Finance

Uljanik to Build Dredger for IHC Merwede

On February 28, 2014, IHC Global Production B.V, part of IHC Merwede, and Uljanik d.d. signed the contract for the construction of one self-propelled cutter suction dredger.

The installed power of the vessel will correspond to 23,684 kW, the length of the vessel will be 152 m and the width 28 m.

The delivery of the vessel is scheduled for April 2016 and same will be constructed in Uljanik Brodogradilište d.d.

[mappress]

March 4, 2014