DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Pallone Announces USD 1.8 M Grant to Repair Sandy Damage (USA)
Business & Finance

September 29, 2013 · about 13 years ago

Pallone Announces USD 1.8 M Grant to Repair Sandy Damage (USA)

Congressman Frank Pallone, Jr. announced that FEMA has awarded $1,833.961 in federal funding to Middlesex County to repair the beach, dunes and groins at the Old Bridge Waterfront Park damaged as a result of Hurricane Sandy. This area sustained significant damage during Sandy and this FEMA funding,

1 minutes read
  • LinkedIn
  • X
  • Email

Congressman Frank Pallone, Jr. announced that FEMA has awarded $1,833.961 in federal funding to Middlesex County to repair the beach, dunes and groins at the Old Bridge Waterfront Park damaged as a result of Hurricane Sandy.

This area sustained significant damage during Sandy and this FEMA funding, which will pay for 90% of the total project cost, will work to restore the area to pre-storm conditions.

“This critical funding will bring us a step closer to rebuilding the Old Bridge Waterfront Park, and help restore normalcy in the aftermath of Superstorm Sandy, ” said Pallone. “ We still have a long way to go to, but I am pleased to see that there is positive movement toward rebuilding from the storm.”

The work for this project has been divided into two geographical sections. Section 1 will include installing 54,400 cubic yards of sand to the beach, repairing the dunes by placing 4,630 cubic yards of sand with plantings for erosion control, and repairing the groins by installing handrails and fixing damaged concrete. Section 2 will include installing 5,500 cubic yards of sand to the beach.

[mappress]

Press Release, September 30, 2013

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  2. 2Høj Nordic completes Schleswig-Holstein annual dredging
  3. 3Oceanside Harbor's channel dredging about to begin
  4. 4HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free