DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Corps Begins Repairs on Riverdale Levee (USA)
Business & Finance

August 26, 2013 · about 13 years ago

Corps Begins Repairs on Riverdale Levee (USA)

Repairs to the Riverdale Levee kickoff yesterday as U.S. Army Corps of Engineers’ officials commence construction on a damaged segment located on the left bank of the St. Joe River just upstream of St. Maries, Idaho. Damages to the levee were caused in April and May 2012 when the St. Joe River twice

2 minutes read
  • LinkedIn
  • X
  • Email

Repairs to the Riverdale Levee kickoff yesterday as U.S. Army Corps of Engineers’ officials commence construction on a damaged segment located on the left bank of the St. Joe River just upstream of St. Maries, Idaho.

Damages to the levee were caused in April and May 2012 when the St. Joe River twice exceeded flood stage. Long duration flows and multiple flood events caused damage to the Riverdale pump station outfall pipe embedded in the levee. In addition, damages reduced the levee from a 50-year flood protection level to just a 10-year level, putting local homes, businesses and infrastructure at risk.

Repairs include removing existing embankment material within the damaged pipe vicinity, replacing the pipe, reconstructing the affected embankment section, and replacing riprap armor along the riverward slope in this reach. Riverdale Drive will remain closed through mid-September while workers excavate the roadway and replace the pipe which runs under the road near the downstream end.

Construction on the $250,000 project is expected to be finished by Sept. 7, restoring the levee to its pre-flood level of protection. Under a cost-share agreement, the Corps pays for 80 percent of project costs and Riverdale Drainage District picks up the remaining 20 percent.

Throughout the planning process the Corps coordinated and worked with a number of state, local and federal agencies, including: Benewah County, Riverdale Drainage District, Coeur d’Alene Tribe Historic Preservation Office, Idaho State Historic Preservation Office, Idaho Department of Environmental Quality, U.S. Fish and Wildlife Service, Idaho Department of Fish and Game, Idaho Department of Lands, and the City of St. Maries.

[mappress]

Press Release, August 27, 2013

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  2. 2Høj Nordic completes Schleswig-Holstein annual dredging
  3. 3Oceanside Harbor's channel dredging about to begin
  4. 4HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free