DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USA: Public Meeting Set for Levee Work in North Sacramento
Business & Finance

June 16, 2013 · about 13 years ago

USA: Public Meeting Set for Levee Work in North Sacramento

The U.S. Army Corps of Engineers Sacramento District is inviting the public to an outreach meeting to discuss upcoming American River levee work in north Sacramento, near the Natomas East Main Drainage Canal. The meeting will be held on Tuesday, June 18, at American River Flood Control District offi

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers Sacramento District is inviting the public to an outreach meeting to discuss upcoming American River levee work in north Sacramento, near the Natomas East Main Drainage Canal.

The meeting will be held on Tuesday, June 18, at American River Flood Control District office (165 Commerce Circle, Sacramento).

Representatives from federal, state and local agencies will be available to answer questions about the construction method and associated construction activities scheduled to begin in July and continue through November.

The American River levee work is necessary to install 3,300 linear feet of seepage cutoff wall in the center of a levee section along the north bank of the American River, just east of its confluence with the Natomas East Main Drainage Canal. This section, referred to as NEMDC South, is trespassed by an assortment of buried utilities and complicated by land easement rights, an inactive railroad line and rights of entry.

The Corps built more than 20 miles of seepage cutoff walls into American River levees between 2000 and 2002. Areas where construction was complicated by encroachments such as power lines, bridges or utilities were set aside for later construction. Cutoff walls help prevent water from seeping through and underneath the levee as it flows from Folsom Dam to the Sacramento-San Joaquin River Delta.

Specific construction times will depend on a number of factors including weather and wildlife nesting.

[mappress]

Press Release, June 17, 2013

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  2. 2Høj Nordic completes Schleswig-Holstein annual dredging
  3. 3Oceanside Harbor's channel dredging about to begin
  4. 4HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free