DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USA: Freeport Harbor Dredging Scheduled for May 29
Business & Finance

May 19, 2013 · about 13 years ago

USA: Freeport Harbor Dredging Scheduled for May 29

The U.S. Army Corps of Engineers, Galveston District, awarded a contract in the amount of $3,600,200 to Mike Hooks Inc., for maintenance dredging of the Freeport inside channel and turning basins in Brazoria County, Texas. The contractor is required to remove approximately 538,000 cubic yards of sho

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, Galveston District, awarded a contract in the amount of $3,600,200 to Mike Hooks Inc., for maintenance dredging of the Freeport inside channel and turning basins in Brazoria County, Texas.

The contractor is required to remove approximately 538,000 cubic yards of shoaled material from the channel using a pipeline dredge with dredged material placement in an adjacent upland disposal area.

“This dredge work will remove draft restrictions that would otherwise prevent deep draft ships from accessing one of the nation’s top petrochemical complexes, providing unrestricted navigation to the strategically important port, ” said John Machol, an operations manager with USACE Galveston District. “ Port Freeport is ranked 30th in the nation in gross tonnage and 16th in the nation for importing foreign cargo.”

According to Machol, work is scheduled to begin May 29, 2013, with an estimated completion date of November 2013.

The Freeport Harbor deep draft navigation project consists of an approximately 8.5 mile long, 45-feet deep by 400-feet wide channel, extending from the Gulf of Mexico through a jettied inlet to a turning basin at the Freeport port facilities. The project also includes two rock jetties.

[mappress]

Press Release, May 19, 2013

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Dredgit gears up for North East River dredging job
  2. 2Work on USACE's newest hopper dredger Donnelly in full swing
  3. 3Royal IHC, Nauplius extend strategic partnership
  4. 4Canada invests in Miminegash Small Craft Harbor project

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free