DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USA: Public Meeting Set for Levee Work at Watt Avenue Bridge
Business & Finance

May 13, 2013 · about 13 years ago

USA: Public Meeting Set for Levee Work at Watt Avenue Bridge

The U.S. Army Corps of Engineers Sacramento District is inviting the public to an outreach meeting to discuss upcoming American River levee work on top of the Watt Avenue bridge in Sacramento. The meeting will be held on Thursday, May 23, at Arden-Dimick Public Library, 891 Watt Avenue, Sacramento,

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers Sacramento District is inviting the public to an outreach meeting to discuss upcoming American River levee work on top of the Watt Avenue bridge in Sacramento.

The meeting will be held on Thursday, May 23, at Arden-Dimick Public Library, 891 Watt Avenue, Sacramento, CA.

Representatives from federal, state and local agencies will be available to answer questions about the construction method and associated construction activities scheduled to begin in May and continue through November. Nighttime partial lane-closures on Watt Avenue’s bridge over the American River are expected in late July, as well as additional public outreach as construction nears.

The levee work on top of Watt Avenue bridge’s north side is necessary to close a gap in the existing seepage-cutoff wall inside the levee, on either side of the bridge. Connecting the wall will help prevent water from seeping through and underneath the levee as it flows from Folsom Dam to the Sacramento-San Joaquin River Delta.

The Corps built more than 20 miles of seepage cutoff walls into American River levees between 2000 and 2002. Areas where construction was complicated by encroachments such as utilities, power lines or bridges, were set aside for later construction.

[mappress]

Press Release, May 14, 2013

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  2. 2Høj Nordic completes Schleswig-Holstein annual dredging
  3. 3Oceanside Harbor's channel dredging about to begin
  4. 4HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free