DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Army Corps Responds to Eastern Washington Flood Threats (USA)
Business & Finance

May 12, 2013 · about 13 years ago

Army Corps Responds to Eastern Washington Flood Threats (USA)

In response to potential flooding in eastern Washington, officials from the U.S. Army Corps of Engineers, Seattle District, are sending flood teams to the Yakima and Okanogan Basins. One three-person flood team arrived in Yakima County Thursday and is supplying 1,000 tons of rock and overseeing its

2 minutes read
  • LinkedIn
  • X
  • Email

In response to potential flooding in eastern Washington, officials from the U.S. Army Corps of Engineers, Seattle District, are sending flood teams to the Yakima and Okanogan Basins.

One three-person flood team arrived in Yakima County Thursday and is supplying 1,000 tons of rock and overseeing its use, inspecting problem areas and levees, and providing technical assistance. Snow melt and rain are forecast to impact river basins over the next week there. The Northwest River Forecast Center has issues flood warnings for the Naches, Okanogan, Colville, Kettle and Stehekin Rivers.

The Seattle District members already in Yakima County are providing rock and technical oversight for the damaged Rambler’s Park Levee. The levee was previously repaired in 2006 but was damaged again in 2012 flooding. Repairs for existing damage are scheduled for later this summer, and potential damage during this event could adversely impact scheduled repairs. If the levee were to breach, public infrastructure including sewer, communication and power lines could all be affected.

Two more flood team members arrive later today in the Okanogan Basin, which is currently at flood stage and is scheduled to last through May 17. Another team of three is scheduled to arrive Saturday. Areas of concern are along the Okanogan (Riverside and City of Okanogan levees) and Methow (Twisp levee).

The Kettle and Stehekin rivers are forecast to reach or exceed moderate flood stage, and a flood warning has been issued by the National Weather Service. Additional flood teams are on alert should communities in those basins request technical or direct assistance.

Public Law 84-99 enables the Corps to assist state and local authorities in flood fight activities and cost share in the repair of flood protection structures.

[mappress]

Press Release, May 13, 2013

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  2. 2Høj Nordic completes Schleswig-Holstein annual dredging
  3. 3Oceanside Harbor's channel dredging about to begin
  4. 4HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free