DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USA: Environmental Management Program for Mississippi River Introduced
Business & Finance

January 1, 2013 · about 13 years ago

USA: Environmental Management Program for Mississippi River Introduced

The U.S. Army Corps of Engineers, St. Paul District, intends to issue an Invitation for Bid (IFB) for restoration and stabilization of a side channel/island complex located on the Wisconsin side of the Mississippi River navigation channel in Pool 9, 5 miles downstream of Lansing, IA. The project sit

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, St. Paul District, intends to issue an Invitation for Bid (IFB) for restoration and stabilization of a side channel/island complex located on the Wisconsin side of the Mississippi River navigation channel in Pool 9, 5 miles downstream of Lansing, IA. The project site is located in the Upper Mississippi River National Wildlife and Fish Refuge.

Project will involve restoration and stabilization of a side channel/island complex (located on the Wisconsin side of the Mississippi River navigation channel in Pool 9, 5 miles downstream of Lansing, IA). The project site is located in the Upper Mississippi River National Wildlife and Fish Refuge. Work includes construction of new islands with a base of granular fill; top-soiled with fine-grained dredge material; planted with willows and grasses; and the shorelines stabilized with rock groins and mounds.

Fine and granular fill will be dredged in the immediate area to enhance fish habitat. Emergent wetland will be created with some of fine-grained dredged material. No land based access to construct project features is available and shallow water draft (6 feet or less) marine plant will be required.

This procurement is 100% set-aside for small business concerns. The estimated price is between $5,000,000 and $10,000,000. The North American Industry Classification System (NAICS) code is 237990 with a small business size standard of $33.5 million. All responsible sources may submit a bid which shall be considered by the agency. The estimated date for completing contract performance, with exception to the seed and willow establishment periods, is June 2014.

[mappress]

Press Release, January 2, 2013

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Boskalis and Van Oord begin IJsselmeerdijk project
  2. 2USACE completes West Harbor dredging project
  3. 3EXCLUSIVE: GRSE, Damen sign MoU on construction of advanced dredgers
  4. 4Lyttelton Port gears up for its largest expansion project

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free