DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USACE Seeks Contractor for Yaquina Repair Work (USA)
Business & Finance

October 30, 2012 · about 14 years ago

USACE Seeks Contractor for Yaquina Repair Work (USA)

The U.S. Army Corps of Engineers, Portland District is seeking eligible businesses to provide for the emergent support requirements and the yearly maintenance and overhaul/dry-docking of the USACE Trailing Suction Hopper Dredge YAQUINA. YAQUINA has Overall Length of 200 ft, a Beam of 58 ft, a Normal

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, Portland District is seeking eligible businesses to provide for the emergent support requirements and the yearly maintenance and overhaul/dry-docking of the USACE Trailing Suction Hopper Dredge YAQUINA.

YAQUINA has Overall Length of 200 ft, a Beam of 58 ft, a Normal Light Draft Aft of 10 ft 3 inches and is 2001 Long Tons.

The USACE Portland District maintains a USCG Certificate of Inspection as well as an American Bureaus of Shipping (ABS) Loadline for the YAQUINA and all work must meet the standards of those two regulatory bodies.

All overhaul/dry-dock work is to be performed at the contractor’s facility on or about the above mentioned dates. The emergent support requirements may be accomplished at the contractor’s facility or possibly wherever the vessel may be operating, as determined by the Portland District and dredge’s operating schedule.

Area of consideration for the overhaul/dry-docking period is the northwest coast of the continental United States.

Major work items associated with the overhaul/dry-docking include: hopper staging and steel repairs, bow thruster remount, drag arm system winch repairs and machinery overhauls, valve repairs, replacements and general ship systems maintenance and repair work.

[mappress]

Dredging Today Staff, October 30, 2012

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceEquipmentTechnologyVessels

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Jan De Nul's TSHD Diogo Cão raises the bar in Vlissingen
  2. 2Skanska builds new homeport pier at Naval Station Newport
  3. 3Ecocoast, Xylem partnership strengthens turbidity monitoring for GCC dredging projects
  4. 4Seaward Marine wins $15.2M Virginia Beach contract

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free