DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›News›Port of San Diego to Conduct Public Hearing on Development Project (USA)
News

August 5, 2012 · about 14 years ago

Port of San Diego to Conduct Public Hearing on Development Project (USA)

The Port of San Diego has completed its final report on the environmental impacts of a proposed pier replacement project at BAE Systems San Diego Ship repair facility, located at 2205 E. Belt Street, San Diego. The project will replace and modernize deteriorated facilities and help to service commer

2 minutes read
  • LinkedIn
  • X
  • Email

The Port of San Diego has completed its final report on the environmental impacts of a proposed pier replacement project at BAE Systems San Diego Ship repair facility, located at 2205 E. Belt Street, San Diego.

The project will replace and modernize deteriorated facilities and help to service commercial and Navy vessels. The final environmental impact report (EIR) summarizes the possible environmental impacts of constructing the project, including how it might affect water quality, biological resources, and other areas.

A public hearing on the final EIR will be held at 1 p.m. on August 14, 2012, at the regular Board of Port Commissioners monthly meeting. The meeting will take place in the Board Room of the Port Administration Building, 3165 Pacific Highway, in San Diego.

Members of the public, organizations, and governmental agencies are encouraged to attend the hearing.

The proposed project includes the following activities at the BAE Systems San Diego facility:

– Demolition of Piers 4 and 5,

– Removal of five mooring dolphins (structures built in the water for vessels to tie to for stability at berth),

– Construction of new bulkhead sections (a shoreline wall dividing the land and the water),

– Relocation of shoreline infrastructure,

– Dredging,

– Construction of a new Pier 4,

– Construction of a new mooring dolphin.

At the August 14 public hearing, the Board of Port Commissioners will asked to approve issuance of a non-appealable Coastal Development Permit. The project does not fall into a category considered to be appealable to the Coastal Commission.

[mappress]

Dredging Today Staff, August 6, 2012; Image: portofsandiego

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

News

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  2. 2Høj Nordic completes Schleswig-Holstein annual dredging
  3. 3Oceanside Harbor's channel dredging about to begin
  4. 4HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free