DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›News›Army Corps to Host Sheyenne River Flood Risk Management Study (USA)
News

July 2, 2012 · about 14 years ago

Army Corps to Host Sheyenne River Flood Risk Management Study (USA)

The U.S. Army Corps of Engineers, St. Paul District, along with Valley City, N.D., will hold a public meeting July 10 to provide background information on and introduce the public to the Valley City Sheyenne River Flood Risk Management Feasibility study. The purpose of this study is to evaluate alte

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, St. Paul District, along with Valley City, N.D., will hold a public meeting July 10 to provide background information on and introduce the public to the Valley City Sheyenne River Flood Risk Management Feasibility study.

The purpose of this study is to evaluate alternatives for flood risk management in Valley City.

The purpose of this meeting is to present initial information about the feasibility study and to provide a forum for public feedback. The meeting will be held July 10 at the Valley City High School, 493 Central Ave. N. The meeting will begin at 6:30 p.m. with an open house, followed by a formal presentation at 7 p.m. and a question and answer period at 7:30 p.m.

The study has been broken into three phases. The first phase of the study is currently underway and is anticipated to be complete in December of 2012.

Phase 1 tasks include initial data collection, an update to the area hydrology, analysis of the current flood damage reduction projects and the development of the initial alternatives. The array of alternatives includes no action or continuing emergency flood fight measures, non structural measures such as raising buildings or relocation, and structural measures such as levees and floodwalls.

Phase 1 analysis will determine the federal government’s role in implementing a flood risk management project in Valley City.

The next two phases of the study will be carried out in 2013 and 2014. Project alternatives will be compared and evaluated in Phase 2 and a tentatively selected plan will be established. Phase 3 will include the development of the tentatively selected plan.

[mappress]

Dredging Today Staff, July 3, 2012

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

News

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  2. 2Høj Nordic completes Schleswig-Holstein annual dredging
  3. 3Oceanside Harbor's channel dredging about to begin
  4. 4HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free