DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›News›DEQ OKs Midland Cleanup Plan (USA)
News

June 3, 2012 · about 14 years ago

DEQ OKs Midland Cleanup Plan (USA)

The DEQ has approved Dow Chemical Company’s five-year work plan to address dioxin-contaminated soils in Midland. The cleanup plan was submitted as part of corrective action work required under the company’s Hazardous Waste Management Facility Operating License. The contamination is the result of air

1 minutes read
  • LinkedIn
  • X
  • Email

The DEQ has approved Dow Chemical Company’s five-year work plan to address dioxin-contaminated soils in Midland.

The cleanup plan was submitted as part of corrective action work required under the company’s Hazardous Waste Management Facility Operating License. The contamination is the result of airborne emissions from Dow’s historic waste management practices.

With the work plan approved, Dow will immediately proceed with soil sampling at residential properties that are scheduled to be addressed in 2012 and will offer cleanup for properties that test above the site-specific dioxin “action level” of 250 parts per trillion for Midland area residential soils.

Properties that test less than or equal to the action level and those that have had cleanup will not be considered contaminated under Michigan law. Sampling and cleanup work will be done only with the consent of the property owner.

The approval follows a March 1 informational meeting, an April 17 public hearing, and a 45‑day public comment period that ended April 25. As part of the work plan review and approval process, the DEQ considered and has provided a written response to all significant public comments.

[mappress]

Dredging Today Staff, June 4, 2012

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

News

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  2. 2Høj Nordic completes Schleswig-Holstein annual dredging
  3. 3Oceanside Harbor's channel dredging about to begin
  4. 4HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free