DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›News›China: CCCC Second Harbour Engineering Lands Hubei Longzhouyuan Contract
News

March 4, 2012 · about 14 years ago

China: CCCC Second Harbour Engineering Lands Hubei Longzhouyuan Contract

On February 21, 2012, CCCC Second Harbour Engineering Company Ltd. signed the approach channel project of Hubei Longzhouyuan Shiplock (Bid W4). The contact value is 129 million yuan, and the construction time limit is 16 months. As a part of the Water Diversion Engineering from the Yangtze River to

1 minutes read
  • LinkedIn
  • X
  • Email

On February 21, 2012, CCCC Second Harbour Engineering Company Ltd. signed the approach channel project of Hubei Longzhouyuan Shiplock (Bid W4). The contact value is 129 million yuan, and the construction time limit is 16 months.

As a part of the Water Diversion Engineering from the Yangtze River to the Hanjiang River, the project mainly comprises approach channel excavation, bank slop cutting and leveling, slope protection, river bottom protection, breasting dolphin construction at the anchoring areas, and ancillary facility installation. Along the 1270 m upstream approach channel and the 750 m downstream approach channel of Longzhouyuan Shiplock, there will be 20 and 21 breasting dolphins respectively.

The implementation of the project is of great significance with respect to the full development of the Hanjiang River’s navigation function and alleviation of adverse effects brought by total water amount reduce of the middle and lower reaches of the Hanjiang River.

[mappress]

Dredging Today Staff, March 5, 2012

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

News

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  2. 2Høj Nordic completes Schleswig-Holstein annual dredging
  3. 3Oceanside Harbor's channel dredging about to begin
  4. 4HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free