DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›News›Belgium: Beverdonk Container Terminal Almost Ready
News

December 21, 2011 · about 14 years ago

Belgium: Beverdonk Container Terminal Almost Ready

This Friday, 23 December, the mobile container crane for the new Beverdonk Container Terminal on Albertkanaal, will be delivered. Precisely a week earlier, the terminal itself was completed. It will become operational at the beginning of 2012. The terminal currently occupies 2.5 ha and has a 200-met

1 minutes read
  • LinkedIn
  • X
  • Email

This Friday, 23 December, the mobile container crane for the new Beverdonk Container Terminal on Albertkanaal, will be delivered.

Precisely a week earlier, the terminal itself was completed. It will become operational at the beginning of 2012. The terminal currently occupies 2.5 ha and has a 200-metre quay. It can cope with an annual 60,000 TEU of containers. In time, the surface area of the terminal can be extended to 10 ha. and the quay to 500 metres. The terminal capacity will then be 300,000 TEU. A total of four container cranes will then be deployed.

The DP World terminal is available to any user and for departures to any seaport, and will initially be open from 6 a.m. to 10 p.m. In time, this will be 24/7.

They are aiming at 80% bundling of containers at the terminal and 20% local volume. The latter is linked, among other things, to logistics platforms which are being developed in phases on both sides of the terminal. Between now and 2020, the headroom of all bridges on Albertkanaal will be raised to 9.20 metres, making container shipping with four layers of containers possible.

[mappress]

Dredging Today Staff, December 22, 2011;

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

News

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Louisiana CPRA wraps up dredging of six crevasses
  2. 2PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  3. 3Høj Nordic completes Schleswig-Holstein annual dredging
  4. 4Oceanside Harbor's channel dredging about to begin

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free